Abstract:Using the main component analysis theory and the multilevel judge method synthetically, this paper discusses the optimization problems in the construction projects of the LDPL natural gas deposits in Sichuan Province. It has been proved the method used in this paper is scientific and superior. So the method can be utilized in the similar context.